SoumissiaFR  ·  Prices
Samples

What our work looks like

Three short extracts so you can judge the quality before sending us anything.

These samples are written for a fictional assignment ("Feasibility study and detailed design of 45 km of rural roads"). They are not copied from any client document. Every client file stays confidential.

1. Methodology extract

Technical proposal · section "Approach and methodology"

Phase 1 — Inception (weeks 1 to 4). The team reviews the existing studies and traffic counts and walks the full 45 km alignment with the client's engineers. Output: an inception report that confirms the alignment, the survey programme and the list of road sections that need a geotechnical investigation. The client approves it before any survey starts.

Phase 2 — Surveys and feasibility (weeks 5 to 14). Topographic survey of the corridor (30 m width), test pits every 500 m, traffic counts at 3 stations over 7 days. Two design options are compared on cost, climate resilience and resettlement impact. Output: a feasibility report with a recommended option and its economic return.

Phase 3 — Detailed design and tender documents (weeks 15 to 26). Drawings, bill of quantities, cost estimate and technical specifications for the recommended option, with the ESMP integrated into the works contract.

Why it scores: each phase has dates, an output and a client decision point, and each one answers a sub-criterion of the evaluation grid ("work plan", "quality of the methodology", "understanding of the ToR").

2. Compliance checklist

Checked before every submission
ItemWhat we check
FormsEvery standard form of the RFP is present, in order, signed and dated
Page limitsMethodology and CVs respect the page and format limits
Key expertsEach CV matches the required degree, years and specific experience; dated and signed
Work planThe staffing schedule matches the work plan and the person-months in the financial offer
ReferencesEach reference shows client, value, dates and role, as the form requires
Joint ventureJV or sub-consultant letters are attached and consistent with the team
SeparationNo financial information appears in the technical proposal

3. Before / after

Rewriting a "understanding of the assignment" paragraph
Before

Our firm has extensive experience in road projects and fully understands the objectives of this assignment. We will use a proven methodology and highly qualified experts to deliver high-quality results on time.

After

The 45 km link is the only all-weather access for 12 villages that are cut off for about three months each rainy season. The ToR therefore asks for a design that stays passable in floods, not only the cheapest one. We will compare two drainage options on cost and flood resilience, and present them to the client at the end of week 14.

The "after" version quotes the real problem from the terms of reference, makes a concrete commitment and gives a date. That is what an evaluator can score.

Send us your RFP: quote within 24 hours